Project Name | Hebei publishing media group | Project Introduction | 1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens. |
---|---|---|---|
Project Date | 2022.04 | Equipment used | KS9800,F2*2 |
Project Location | Shijiazhuang, Hebei | Project Requirements | 1. Clear picture quality 2. Convenient operation 3. Perfect effect |