Project Name | Guangzhou Biological Island Exhibition Hall | Project Introduction | Immersive project, wall resolution 4864*1408, left and right secondary resolution 1024*1408, ground resolution 4864*1024 |
---|---|---|---|
Project Date | 2020.07 | Equipment used | Kommander F2×1,ES16×4,G612×240 |
Project Location | GuangZhou | Project Requirements | 1. Point to point display and play without delay 2. It can work on the IPAD |
View all cases
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Hebei Gaobeidian Shanhe formation mould center
Project Name:Hebei Gaobeidian Shanhe formation mould center
Project Date:2020.09
Project Location:Hebei
Project Introduction:Full screen 3200 ✖ 3968, high tech P2 5。 One sv16 + T1 to realize complete point-to-point display.
-
Exhibition Hall of Jingyu Industry Co., Ltd
Project Name:Exhibition Hall of Jingyu Industry Co., Ltd
Project Date:2022.07
Project Location:Shanghai
Project Introduction:1.5 conventional LED screens 2.1 three side immersion 3.1 LCD screens 4.2 column screens
-
Chongqing Wushan Motianling Immersion Project
Project Name:Chongqing Wushan Motianling Immersion Project
Project Date:2022.06
Project Location:Chongqing City
Project Introduction:1.2 Immersive point-to-point display on the panel 2. Tablet cloud control
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Hebei Tangshan Qian'an Tangshan special steel
Project Name:Hebei Tangshan Qian'an Tangshan special steel
Project Date:2021.08
Project Location:Tangshan City, Hebei Province
Project Introduction:The large 4K curved screen in the exhibition hall of Qian'an Tangshan special steel enterprise uses ks9800 video processor. Ks9800 video processor supports kystar frame synchronization (KFS) technology, which can ensure the complete frame synchronization
-
Chutian medicine exhibition hall
Project Name:Chutian medicine exhibition hall
Project Date:2021.11
Project Location:Ningxiang City, Hunan Province
Project Introduction:4K large screen
-
Weifang xiguanting village exhibition hall
Project Name:Weifang xiguanting village exhibition hall
Project Date:2020.11
Project Location:Weifang, Shandong
Project Introduction:One arc giant screen, seven long vertical screens, and three large screens of sand table.
-
Zhejiang Taizhou Laoshui plant
Project Name:Zhejiang Taizhou Laoshui plant
Project Date:2021.07
Project Location:Taizhou City, Zhejiang Province
Project Introduction:The space-time corridor, wall surface, top surface and column form a whole