中文

Latest Case

heze
heze
Project Name Heze Ski Resort Project Introduction Tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel.
Project Date 2020.09 Equipment used LS16*2、LS2*1、F2*1、G612*200
Project Location Heze City, Shandong Province Project Requirements Picture synchronization; Uniformly control the playback of all screens; Maximize playback effect.

View all cases